This week we continued to work within our groups to develop the design, structure and mechanics of the building. We sketched our ideas out, continually revising what we had to correlate with interior schemes, engineering designs and the exterior facade. We are starting to see how different components of the building can be either tightly […]

TEAM 3 – WEEK 15 Read More »

This week, we continued the exploration and evolution of our designs within our respective groups. We talked about how to express and describe the drivers of our design concepts. We learned more about to integrate different sub teams within the project to develop aspects of the design that immediately effect each other. While we spent

TEAM 3 – WEEK 14 Read More »

This week, in the architecture group, we continued the development of the building’s massing (form). We arrived at three different options which we will continue to develop and narrow down in week 13. The engineering and construction groups met to discuss various systems which could be used in the building. They also talked about the possible

TEAM 3 – WEEK 12 Read More »

This week, we got to have a Q&A session with the mentors about their college experiences and what we can look for when it comes to different public and private colleges, various university experiences and majors. After that, we broke out into our groups where we progressed each portion of the project. Each team talked

TEAM 3 – WEEK 13 Read More »

The Design Project – Production Time! What: Production for the competition! Where: Stantec, 224 South Michigan Avenue, Suite 1400 When: Thursday, February 23, 5:00 – 7:00 pm Why: PRODUCTION! PRODUCTION! PRODUCTION!       Important Files: 2017-02-23_Milestones Blog Quiz: N/A Next Meeting Where: Stantec, 224 South Michigan Avenue, Suite 1400 Next Meeting When: Thursday, February

TEAM 1 / WEEK 13 / 2016-2017 Read More »

The Design Project – Production Time! What: Graphics Presentation and Production for the competition! Where: Stantec, 224 South Michigan Avenue, Suite 1400 When: Thursday, February 16, 5:00 – 7:00 pm Why: PRODUCTION! PRODUCTION! PRODUCTION!   Important Files:     2017-02-16_Milestones PRESENTATION + REPRESENTATION Blog Quiz: N/A Next Meeting Where: Stantec, 224 South Michigan Avenue, Suite

TEAM 1 / WEEK 12 / 2016 – 2017 Read More »

This week, students and mentors met at CannonDesign’s office to further develop their programmed spaces through structural decisions and application of ideas into BIM. Engineers from Thornton Tomasetti gave a presentation on common structural systems and the different effects varying loads can have on those structures. The students compared steel building systems to concrete systems, discussing benefits

TEAM 4 – WEEK 10 Read More »

For week 11, we watched a presentation which described the engineering profession in more detail. After the presentation, we went through a plenum exercise. In this case, the plenum is the space between the ceiling and the floor above. In the plenum exercise, we had to try to fit all of the building system components

TEAM 3 – WEEK 11 Read More »

The Design Project – Production Time!   What: Basic Structural Elements PK / Teamwork towards achieving milestones & client comments / OLD BUILDING & NEW BUILDING Presentations Where: Stantec, 224 South Michigan Avenue, Suite 1400 When: Thursday, February 9, 5:00 – 7:00 pm Why: This week Mentor Stacy presented about structures basics and we touched on professional liability.

TEAM 1 / WEEK 11 / 2016-2017 Read More »

This week, we had our client presentations. Three individuals from the Perkins and Will office served as our clients. We would like to thank Bridget Lesniak, Doug Smith and James Giebelhausen for joining us and providing feedback.   We presented our preliminary site analysis, programmatic bubble diagrams, design concept (parti), and formal massing which we

TEAM 3 – WEEK 10 Read More »

Scroll to Top