This week’s meeting focused on branding environment, interiors and beginning design process. Students engaged in a visual listening activity where they placed stickers on images that either had an interesting architecture or interiors that appealed to the students in some way. Many images will then be used as inspiration for the students as they begin […]
Upon return from the holiday break, Team 2 students were excited and eager to get back to work! We did a quick recap of our meeting with the client in Week 6 then parred down the programmatic concept list to the following: – Performance space – Job Opportunities – Mural – Garden – Synergy
Team 2 is moving right along! Before the Winter Break we met with our client, representatives from Focal Point as well as the lead designers and project managers from their team. The students finalized their preliminary ideas for the site and presented these concepts. What followed was a great discussion and feedback session which have
This week Team 3’s ACE meeting began with a brief overview of ARUP’s sound lab and structural engineering. ARUP’s sound lab showed students the importance of the acoustics of a space. And the structural presentation gave a brief overview of structural concepts and materials. Concepts such as how live loads and dead load contribute to the total load of
Our meeting this week started with a presentation on Construction Management. Mentors from Lend Lease described each facet of the profession, including safety, estimating, cost control, scheduling, and project close out. Following the presentation, the students broke into two groups for a scavenger hunt activity. Each team was given a series of questions that had to
College Night…Resumes…What to expect… “If you don’t go after what you want, you’ll never have it. If you don’t ask, the answer is always no. If you don’t step forward, you’re always in the same place.” –Nora Roberts Week 6 was held at Gilbane and we learned a lot about College and what the different majors entail
For Week 6’s activity, Team 4 met at the Chicago Architecture Foundation’s Lego Studio. The space is open to the public and has open build opportunities weekly. CAF led the Week 6 activity which explored texture, span, elevation, and enclosure. The students and mentors were each asked to build something using the Legos at hand
For Week 6’s activity, Team 4 met at the Chicago Architecture Foundation’s Lego Studio. The space is open to the public and has open build opportunities weekly. CAF led the Week 6 activity which explored texture, span, elevation, and enclosure. The students and mentors were each asked to build something using the Legos at hand
This week Team 3 focused on Sustainability and Site Planning. The meeting started with a presentation on sustainable concepts and the LEED program, and included a case study of the Spaulding Rehabilitation Hospital in Boston, MA. This was followed by a brief introduction to Site Analysis, showing how to study local effects of pedestrian and vehicular traffic
This week’s meeting began at Power’s field office for the new Rehabilitation Institute of Chicago building in Streeterville. During dinner, we saw a quick presentation about the project background. We then donned our hard hats and safety glasses and headed a few blocks over to the construction site entrance. We took the elevator lift up
Team 7 / Week 6 : Site Visit Read More »