This week, in the architecture group, we continued the development of the building’s massing (form). We arrived at three different options which we will continue to develop and narrow down in week 13. The engineering and construction groups met to discuss various systems which could be used in the building. They also talked about the possible cost of these systems. Towards the end of the night, all groups came together to give everyone an update on their respective portions of the project. While many of the following weeks will be working weeks, we continue to grow our understanding around the steps needed to design and actualize the combination of architecture and engineering.