On June 26, the design-build charrette began at Santa Lucia School located in Bridgeport. The students split up into teams to design the outdoor class. Every students had different creative ideas for the design. The students and staff of Santa Lucia enjoyed everyones creative thoughts for their outdoor classroom.
We are excited for the next 6 weeks to come and we cannot wait to start tearing up concrete soon!
Stay tuned,
ACE DB Students